Largest operating AI data centers, mid-2026
One row per facility: Epoch AI's IT power estimate and FactHub's derived annual energy and household equivalents.
Unit of observation: One data center campus
| facility | owner | location | it_power_mw MW | estimate_date | annual_gwh_full_it_load GWh per year | households_full_it_load homes | households_half_it_load homes |
|---|---|---|---|---|---|---|---|
| Colossus 2 | xAI (listed by Epoch AI as SpaceXAI) | Memphis, TN | 946 | 2026-06-15 | 8287.0 | 767951 | 383976 |
| Anthropic-Amazon New Carlisle | Amazon | New Carlisle, IN | 910 | 2026-06-03 | 7971.6 | 738727 | 369364 |
| Microsoft Fairwater Atlanta | Microsoft | Fayetteville, GA | 636 | 2026-06-14 | 5571.4 | 516297 | 258148 |
| Meta Prometheus | Meta | New Albany, OH | 562 | 2026-08-01 | 4923.1 | 456225 | 228112 |
| OpenAI Stargate Abilene | Oracle | Abilene, TX | 421 | 2026-05-23 | 3688.0 | 341763 | 170882 |
8 field definitions
| Field | Type | Meaning | Units | Value type |
|---|---|---|---|---|
facility |
string | Facility name as Epoch AI lists it. | — | observed |
owner |
string | Owner as Epoch AI lists it. | — | observed |
location |
string | City and state. | — | observed |
it_power_mw |
number | Estimated IT power capacity available to chips, servers and other IT equipment, excluding cooling. | MW | estimated |
estimate_date |
date | Date of the capacity estimate. | — | observed |
annual_gwh_full_it_load |
number | Electricity the IT load would use running at full capacity for a year. | GWh per year | derived |
households_full_it_load |
integer | Average U.S. homes using the same electricity in a year, at full IT load. | homes | derived |
households_half_it_load |
integer | Same, if the IT load averaged half its capacity. | homes | derived |