Fiscal year 2025 CCA line items with lifetime emission-cut estimates
Each Appendix B row marked as expected to cut emissions and given a numeric estimate, sorted from lowest to highest cost per ton.
Unit of observation: Appendix B line item
| project_id | agency | program | recipient | county | category | fy2025_cca_spending_usd US dollars | lifetime_reduction_tco2e metric tons CO2-equivalent | cost_per_ton_usd US dollars per metric ton CO2e | reported_cost_per_ton_usd US dollars per metric ton CO2e | possible_duplicate_tonnage | report_pdf_page | description |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| p001 | Department of Transportation |
Marine Construction - State
|
N/A
|
Kitsap
|
Ferry hybrid-electric conversion | 499492 | 37687.2 | 13.25 | 69 | yes | 371 |
SR 305/Bainbridge Island TRM - Electrical Connection for Hybrid. Provides infrastructure to charge hybrid-electric vessels at the Bainbridge Island ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p002 | Department of Transportation |
Marine Construction - State
|
N/A
|
Kitsap
|
Ferry hybrid-electric conversion | 417697 | 18602.5 | 22.45 | 80 | yes | 372 |
SR 304/Bremerton Tram - Electrical Connection for Hybrid. Provides infrastructure to charge hybrid-electric vessels at the Bremerton ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p003 | Department of Commerce |
Hard-to-Decarbonize Sector & Economic
|
Lamb Weston Inc
|
Franklin
|
Industrial and clean-fuel projects | 2875000 | 84125.1 | 34.18 | 34 | no | 134 |
This project will replace six preheaters with two Pulsed Electric Field Systems to reduce natural gas consumption and improve energy efficiency.
|
| p004 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Clark
|
State agency vehicles and buildings | 55744 | 1441 | 38.68 | 41 | no | 257 |
Funding is for electric vehicle charger installation at Washington Department of Fish and Wildlife's Ridgefield office to advance the agency’s transition to a low-emissions fleet.
|
| p005 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Underwood Conservation District
|
Klickitat
|
Farms, soils and waste | 220456 | 4489 | 49.11 | 49 | no | 493 |
A screw press solids/liquids separator was installed at an organic dairy in Trout Lake, WA. The dairy now can separate solid and liquid manure waste. This has several benefits, including the ability to precisely apply liquids through a pivoted irrigation system, the ability to compost solids before land application, increased lagoon capacity and cleanout ability, and reduced machine hauling (fewer loads of land applied solids).
|
| p006 | Department of Transportation |
Port of Anacortes Electrification
|
Port of Anacortes
|
Skagit
|
Industrial and clean-fuel projects | 75534 | 1397.7 | 54.04 | 118 | no | 372 |
Design is 90% for the shore power installation. Permitting is complete for this project.
|
| p007 | Department of Transportation |
Marine Construction - State
|
N/A
|
Island
|
Ferry hybrid-electric conversion | 632733 | 11305.8 | 55.97 | 176 | yes | 371 |
SR 525/Clinton TRM - Electrical Connection for Hybrid. Provides infrastructure to charge hybrid- electric vessel at the Clinton ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p008 | Department of Transportation |
Marine Construction - State
|
N/A
|
Kitsap
|
Ferry hybrid-electric conversion | 2112888 | 37687.2 | 56.06 | 69 | no | 371 |
SR 305/Bainbridge Island TRM - Terminal Electrification. Provides infrastructure to charge hybrid-electric vessels at the Bainbridge Island ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p009 | Department of Transportation |
Marine Construction - State
|
N/A
|
Kitsap
|
Ferry hybrid-electric conversion | 1077505 | 18602.5 | 57.92 | 80 | no | 372 |
SR 304/Bremerton Tram - Terminal Electrification. Provides infrastructure to charge hybrid-electric vessels at the Bremerton ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p010 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Stevens
|
State agency vehicles and buildings | 4977 | 84.7 | 58.76 | 59 | no | 312 |
Department of Natural Resources' Sustainable Operations program Installed one Level 2 EV charger at Colville Department of Natural Resources site.
|
| p011 | Department of Commerce |
Hard-to-Decarbonize Sector & Economic
|
Lamb Weston Inc
|
Benton
|
Industrial and clean-fuel projects | 1727262 | 27003.7 | 63.96 | 64 | no | 134 |
Retrofitting the existing boilers with an economizer and upgrading controls as well as installing an ammonia desuperheater to capture waste heat from the refrigeration system. These systems will capture thermal energy to heat incoming water, reducing gas usage and emissions and providing an alternative to adding a third boiler. Project also includes installing a solar parking lot by replacing diesel powered lights with solar powered lights.
|
| p012 | Department of Commerce |
Electrical Grid Integration and Innovation
|
Community Services of Moses Lake
|
Grant
|
Solar and grid | 6525 | 97.2 | 67.13 | 67 | no | 101 |
This project will install a 92.2 kW DC / 86.4 kW AC grid -tied, net- metered rooftop solar array and a battery energy storage system. The system will be able to support critical loads for 12 hours using a 125- kW inverter and 880 kWh of energy storage.
|
| p013 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Skagit
|
State agency vehicles and buildings | 5709 | 84.7 | 67.40 | 67 | no | 312 |
Department of Natural Resources’ Sustainable Operations program installed one Level 2 EV charger at Sedro Woolley Department of Natural Resources site.
|
| p014 | Department of Enterprise Services |
Zero Emission EV Supply Equipment Infrastructure
|
Washington State Health Care Authority
|
Thurston
|
EV charging | 18512 | 254 | 72.88 | 74 | no | 253 |
The Washington State Health Care Authority installed ten Single Head L2 chargers at Cherry Street Plaza.
|
| p015 | Department of Commerce |
23-25 Community EV Charging
|
City of Mukilteo
|
Snohomish
|
EV charging | 3100 | 40.6 | 76.35 | 763 | no | 132 |
Funds were used to build a reliable EV charging network in communities across Washington. This expenditure funds Level 2 Chargers at fleet depot sites.
|
| p016 | Department of Natural Resources |
Greenhouse Gas Emissions Reductions/ Infrastructure for Reducing Greenhouse Gas Emissions
|
N/A
|
Pacific
|
State agency vehicles and buildings | 2660 | 25.4 | 104.72 | 105 | no | 316 |
Purchased one Level 2 charging station and upgraded infrastructure for future install at Menlo Department of Natural Resources site.
|
| p017 | Department of Transportation |
Marine Construction - State
|
N/A
|
King
|
Ferry hybrid-electric conversion | 27573572 | 261594.5 | 105.41 | 105 | no | 371 |
Conversion to hybrid electric propulsion for the Jumbo Mark II vessels. Converted the Wenatchee and procured equipment for the Tacoma and Puyallup.
|
| p018 | State Conservation Commission |
Riparian Restoration with Landowners (RGP)
|
Grays Harbor Conservation District
|
Grays Harbor
|
Habitat and forests | 607587 | 5486 | 110.75 | 111 | no | 508 |
Grays Harbor Conservation District restored 316 acres along 21,890 feet of streams, planting 35,280 trees and shrubs with ten landowners. The district also engaged 53 landowners, identified five new projects, and hosted volunteer planting events.
|
| p019 | Department of Transportation |
Port Electrification Competitive Grants
|
Port of Benton
|
Benton
|
Industrial and clean-fuel projects | 7620 | 68.7 | 110.92 | 111 | no | 372 |
The current expenditure reflects work completed during the pre-engineering phase of the project. This included a formal project kickoff meeting, which was attended by Washington State Department of Transportation sponsors and the engineering consultant.
|
| p020 | Department of Transportation |
Green Transportation Grants
|
King County Metro Transit
|
King
|
Transit buses and service | 2678163 | 23579.6 | 113.58 | 114 | no | 390 |
Preliminary and final design electrical power and charging infrastructure as well as other systems required to support up to 250 new battery electric buses that will be purchased and placed in-service at Metro's South Annex Base starting 2027. The project will deliver the charging infrastructure needed to support up to 250 battery electric bus.
|
| p021 | Department of Transportation |
Marine Construction - State
|
N/A
|
Island
|
Ferry hybrid-electric conversion | 1352270 | 11305.8 | 119.61 | 176 | no | 371 |
SR 525/Clinton TRM - Terminal Electrification. Provides infrastructure to charge hybrid-electric vessel at the Clinton ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p022 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Whitman Conservation District
|
Whitman
|
Farms, soils and waste | 100000 | 804 | 124.38 | 124 | no | 494 |
Wells were put on the property in different areas due to a lack of water resources and access for cattle. Additional water availability will help cattle and grazing efforts but would help stop erosion on Union Flat Creek banks. Work was conducted to add three different wells, with watering facilities, tanks, troughs, gravel holding pads, and solar power. The landowner was trucking water to all areas almost daily for cattle, and this has significantly reduced emissions during transport.
|
| p023 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Cowlitz
|
State agency vehicles and buildings | 27968 | 211.6 | 132.17 | 132 | no | 312 |
Department of Natural Resources’ Sustainable Operations program Installed five networked Level 2 EV chargers at Castle Rock Department of Natural Resources site.
|
| p024 | Department of Commerce |
23-25 Community EV Charging
|
Trinity Development Alliance Inc
|
Grays Harbor
|
EV charging | 1600 | 12.1 | 132.23 | 844 | no | 131 |
Funds were used to build a reliable EV charging network in communities across Washington. This expenditure funds Level 2 Chargers at multi-family sites.
|
| p025 | Department of Commerce |
Clean Building Performance Grants
|
SHG Hotel SPE LLC
|
King
|
Public and commercial building upgrades | 99721 | 740.9 | 134.59 | 135 | no | 134 |
Design/engineering costs and installation of energy efficiency measures to reduce greenhouse gas emissions and comply with the Clean Buildings Performance Standard. Project is ongoing.
|
| p026 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
King
|
State agency vehicles and buildings | 11846 | 84.7 | 139.86 | 140 | no | 312 |
Department of Natural Resources’ Sustainable Operations program installed one Level 2 EV charger at Enumclaw Department of Natural Resources site.
|
| p027 | Department of Transportation |
Port Electrification Competitive Grants
|
Port of Kalama
|
Cowlitz
|
Industrial and clean-fuel projects | 95362 | 673 | 141.70 | 142 | no | 372 |
The Port of Kalama is installing shore power for its harbor craft; expenditures to date are for the design components of the project.
|
| p028 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 332211 | 2294.4 | 144.79 | 145 | no | 93 |
Yakima County Treasurer will install a solar Photovoltaic (PV) system rated for 226.86 kW DC / 200 kW AC at the Yakima County Road Maintenance Shop and Construction Building. This grant will help Yakima County approach compliance with House Bill 1257 which stipulates energy requirements on facilities over 50,000 sq. ft.
|
| p029 | Department of Commerce |
Competitive Solar Grants
|
Asotin County Fire Protection District
|
Asotin
|
Solar and grid | 214691 | 1458.3 | 147.22 | 147 | no | 94 |
Asotin County Fire District #1 is installing a 130 kW DC / 100 kW AC ground-mounted solar system to offset 100% of the fire station’s annual energy use, reduce greenhouse gas emissions by up to 133 tons per year, and strengthen energy resilience in a wildfire-prone area. The project will lower long-term operating costs, freeing local property tax dollars to support critical fire, EMS, and emergency services for a largely low- to moderate-income community with high rates of poverty, disability, and chronic illness. Construction is underway and scheduled for completion by the end of July 2025, directly benefiting residents by stabilizing costs and demonstrating that small rural agencies can meet state decarbonization goals.
|
| p030 | Department of Commerce |
23-25 Community EV Charging
|
South Puget Sound Community College
|
Thurston
|
EV charging | 7500 | 50.8 | 147.64 | 738 | no | 133 |
Funds were used to build a reliable EV charging network in communities across Washington. This expenditure funds Level 2 Chargers at public sites.
|
| p031 | Department of Natural Resources |
Greenhouse Gas Emissions Reductions/ Infrastructure for Reducing Greenhouse Gas Emissions
|
N/A
|
Thurston
|
State agency vehicles and buildings | 33819 | 227.6 | 148.59 | 149 | no | 317 |
Department of Natural Resources purchased an Electric Utility Terrain Vehicle to replace a gas-powered one that is used at the Department of Natural Resources Meridian Seed Orchard site.
|
| p032 | Department of Commerce |
Tribal Clean Energy Development Projects
|
Nisqually Indian Tribe
|
Thurston
|
Solar and grid | 113180 | 759.7 | 148.98 | 149 | no | 99 |
The project involves the purchase and installation of a 140 kW AC / 175.76 kW DC rooftop solar array on the Wastewater Management Facility. It is expected to save $25,131 in the first year and over $1 million in electricity costs over 30 years. These savings will expand capacity to serve the Nisqually Tribal community and support the Tribe’s pursuit of energy independence and sovereignty.
|
| p033 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 1069560 | 7051 | 151.69 | 152 | no | 93 |
Yakima County Treasurer will furnish and install a solar Photovoltaic (PV) system rated for 645.24 kW DC / 403.2 kW AC at the Yakima County Courthouse Complex. This grant will help Yakima County approach compliance with House Bill 1257 which stipulates energy requirements on facilities over 50,000 sq. ft.
|
| p034 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 310000 | 2042.4 | 151.78 | 152 | no | 93 |
Yakima County will install a solar Photovoltaic (PV) system rated 172.14 kW DC / 100 kW AC at the Yakima County Juvenile Justice Center. This grant will help Yakima County approach compliance with House Bill 1257 which stipulates energy requirements on facilities over 50,000 sq. ft.
|
| p035 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 310000 | 2042.4 | 151.78 | 152 | no | 93 |
Yakima County is installing a 172.14 kW DC / 100 kW AC solar photovoltaic system at the Yakima County Correction Center. This project supports compliance with House Bill 1257, which mandates energy standards for facilities over 50,000 square feet.
|
| p036 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 310000 | 2042.4 | 151.78 | 152 | no | 93 |
Yakima County Treasurer will furnish and install a solar Photovoltaic (PV) system rated for 172.14 kW DC / 100 kW AC at the Yakima County Resource Center (911 Call Center). This grant will help Yakima County approach compliance with House Bill 1257 which stipulates energy requirements on facilities over 50,000 sq. ft.
|
| p037 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Snohomish
|
State agency vehicles and buildings | 31568 | 203.2 | 155.35 | 164 | no | 258 |
Funding is for electric vehicle charger installations at Washington Department of Fish and Wildlife's Stanwood office to advance the agency's transition to a low-emissions fleet.
|
| p038 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
King
|
State agency vehicles and buildings | 54147 | 341.3 | 158.65 | 167 | no | 257 |
Funding is for heat pump installation at the Washington Department of Fish and Wildlife Issaquah Hatchery.
|
| p039 | Department of Agriculture |
Waste Material Management
|
Feeding Washington
|
Snohomish
|
Farms, soils and waste | 43556 | 274 | 158.96 | 159 | no | 75 |
Feeding Washington used funding to purchase food at risk of being wasted from Washington Farms and distributed it to food pantries; grants supported Washington farmers by purchasing food not sold in the market, and they supported people experiencing food insecurity while reducing greenhouse gas emissions through food rescue.
|
| p040 | Department of Agriculture |
Waste Material Management
|
Feeding Washington
|
Adams, Asotin, Benton, Chelan, Clallam, Clark, Cowlitz, Ferry, Franklin, Grant, Grays Harbor, Jefferson, King, Kitsap, Klickitat, Lewis, Lincoln, Mason, Okanogan, Pend Oreille, Pierce, Skagit, Snohomish, Spokane, Stevens, Thurston, Walla Walla, Whatcom, Whitman, Yakima
|
Farms, soils and waste | 818559 | 5143 | 159.16 | 159 | no | 75 |
Feeding Washington used funding to purchase food at risk of being wasted from Washington Farms and distributed it to food pantries; grants supported Washington farmers by purchasing food not sold in the market, and they supported people experiencing food insecurity while reducing greenhouse gas emissions through food rescue.
|
| p041 | Department of Agriculture |
Waste Material Management
|
Feeding Washington
|
Clallam, King, Whatcom
|
Farms, soils and waste | 5593 | 35 | 159.80 | 160 | no | 75 |
Feeding Washington used funding to purchase food at risk of being wasted from Washington Farms and distributed it to food pantries; grants supported Washington farmers by purchasing food not sold in the market, and they supported people experiencing food insecurity while reducing greenhouse gas emissions through food rescue.
|
| p042 | Department of Commerce |
Clean Building Performance Grants
|
Wig Properties LLC - Bell 1
|
King
|
Public and commercial building upgrades | 244404 | 1527.5 | 160.00 | 160 | no | 134 |
Design/engineering costs and installation of energy efficiency measures to reduce greenhouse gas emissions and comply with the Clean Buildings Performance Standard. Project is ongoing.
|
| p043 | Department of Agriculture |
Agricultural Climate Storage and Sequestration
|
Twelve commercial farms in diverse cropping systems across eight Washington counties, collectively managing over 36,000 acres
|
Statewide
|
Farms, soils and waste | 917123 | 5641.2 | 162.58 | 163 | no | 76 |
Funds supported the implementation of a grant program to distribute grants to small farms to support activities that improve carbon storage and sequestration, including agricultural management practices that improve soil health, research that supports carbon storage and emissions reductions on farms, and projects using live native algae. Twelve farms managing over 36,000 acres received grants.
|
| p044 | Department of Commerce |
2023-25 Community Solar Resilience Hubs
|
Methow Valley United Methodist Church
|
Okanogan
|
Solar and grid | 176180 | 1055 | 167.00 | 167 | no | 126 |
This project will install a ground-mounted solar array and battery energy storage system to transform the church building into a community resilience hub, providing resilience against outages from wildfire and weather. The solar array will have a capacity of 71.78 kW DC / 60 kW AC, while the battery system will have a capacity of 308 kWh.
|
| p045 | Department of Commerce |
Competitive Solar Grants
|
Yakima County Treasurer
|
Yakima
|
Solar and grid | 47013 | 270.3 | 173.93 | 174 | no | 93 |
Yakima County Treasurer will furnish and install a solar Photovoltaic (PV) system rated for 37.05 kW DC / 27.6 kW AC at the Yakima County Sheriff Office Precinct 3. This grant will help Yakima County approach compliance with House Bill 1257 which stipulates energy requirements on facilities over 50,000 sq. ft.
|
| p046 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Clallam
|
State agency vehicles and buildings | 14994 | 84.7 | 177.02 | 177 | no | 312 |
Department of Natural Resources' Sustainable Operations program installed one Level 2 EV charger at Port Angeles Department of Natural Resources site.
|
| p047 | Department of Transportation |
Green Transportation Grants
|
King County Metro Transit
|
King
|
Transit buses and service | 7000000 | 38035 | 184.04 | 184 | no | 390 |
Construct electrical power and charging infrastructure, perform civil sitework, and install charge management systems as well as other systems required to support Battery Electric Buses that will be purchased and placed in- service.
|
| p048 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Clallam
|
State agency vehicles and buildings | 31595 | 169.3 | 186.62 | 187 | no | 312 |
Department of Natural Resources' Sustainable Operations program installed two Level 2 networked EV chargers and one Level 2 non-networked charger at Forks Department of Natural Resources site.
|
| p049 | Department of Transportation |
Marine Construction - State
|
N/A
|
King
|
Ferry hybrid-electric conversion | 3726966 | 19910.6 | 187.19 | 187 | no | 371 |
SR 519/Seattle Term - Terminal Electrification. Provides infrastructure to charge hybrid-electric vessels at the Seattle ferry terminal which supports increased effectiveness in reducing air pollution and vessel fuel consumption by allowing hybrid electric vessels to operate fully electric.
|
| p050 | Department of Enterprise Services |
Zero Emission EV Supply Equipment Infrastructure
|
Department of Children, Youth and Families
|
Kittitas
|
EV charging | 14696 | 76.2 | 192.86 | 197 | no | 253 |
The Department of Children, Youth and Families installed three Dual Head L2 chargers in the Ellensburg field office.
|
| p051 | Department of Commerce |
Tribal Clean Energy Development Projects
|
Confederated Tribes of the Chehalis Reservation
|
Grays Harbor
|
Solar and grid | 248550 | 1278.4 | 194.42 | 194 | no | 99 |
This project will furnish and install a solar Photovoltaic (PV) system rated for 120.98 kW DC / 120 kW AC at the Chehalis Tribe's Community Center.
|
| p052 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
South Yakima Conservation District
|
Yakima
|
Farms, soils and waste | 100103 | 511 | 195.90 | 196 | no | 492 |
This project involved cost share for a waste transfer pipeline and a 50-horsepower pump to be installed on a dairy. These practices allow the dairy to apply nutrients from manure wastewater in the dairy's waste storage ponds to over 400 acres of the dairy's crops in a more efficient manner.
|
| p053 | Department of Commerce |
Electrical Grid Integration and Innovation
|
Friends Of the Deming Library
|
Whatcom
|
Solar and grid | 82470 | 420 | 196.36 | 196 | no | 101 |
This project will install a 37.31kW rooftop solar array at the Deming Library that will offset 100% of annual electrical usage and provide electricity for electric car charging ports. Energy savings will be used to expand services and library programs to the community, including the Nooksack Indian Tribe.
|
| p054 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Stevens County Conservation District
|
Stevens
|
Farms, soils and waste | 4744 | 22 | 215.64 | 216 | no | 492 |
This project provided cost-share funding for a local rancher to reseed 27 acres of degraded pastureland for rotational grazing. This project helped to complete two applications of a diverse dryland pasture mix to reestablish a strong cover for grazing.
|
| p055 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Pierce Conservation District
|
Pierce
|
Farms, soils and waste | 12232 | 56 | 218.43 | 218 | no | 491 |
The funding was used to conduct outreach and education on the State Conservation Commission's Sustainable Farm & Field practices via technical assistance visits, to hold five workshops that focused on Sustainable Farm & Field practices, and to distribute pasture and cover crop seed and trees for silvopasture.
|
| p056 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Cowlitz
|
State agency vehicles and buildings | 10787 | 49 | 220.14 | 232 | no | 257 |
Funding is for an electric vehicle pilot lease in Kelso, Washington to advance behavior change campaigns and reduce fleet emissions.
|
| p057 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Chelan, Clallam, Clark, Cowlitz, Grant, Grays Harbor, Mason, Okanogan, Pierce, Skagit, Thurston, Yakima
|
State agency vehicles and buildings | 10787 | 49 | 220.14 | 232 | no | 257 |
Funding is for an electric truck pilot vehicle shared with Washington Department of Fish and Wildlife drivers across the state to expose employees to electric trucks and assess feasibility to transition additional fleet pick-ups to electric alternatives.
|
| p058 | Department of Commerce |
Tribal Clean Energy Development Projects
|
Nisqually Indian Tribe
|
Thurston
|
Solar and grid | 65990 | 280.3 | 235.43 | 235 | no | 99 |
The project includes the purchase and installation of a 75 kW AC / 75 kW DC solar array on the Head Start building. It is expected to reduce the building’s energy costs by $9,278 in the first year and generate over $400,000 in savings over 30 years. These savings will expand the Tribe’s capacity to serve youth while supporting energy independence and Tribal sovereignty.
|
| p059 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Grays Harbor
|
State agency vehicles and buildings | 11699 | 49 | 238.76 | 252 | no | 257 |
Funding is for an electric vehicle pilot lease in Montesano, Washington to advance behavior change campaigns and reduce fleet emissions.
|
| p060 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Snohomish
|
State agency vehicles and buildings | 11699 | 49 | 238.76 | 252 | no | 257 |
Funding is for an electric vehicle pilot lease in Mill Creek, Washington to advance behavior change campaigns and reduce fleet emissions.
|
| p061 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Clark
|
State agency vehicles and buildings | 11699 | 49 | 238.76 | 252 | no | 257 |
Funding is for an electric vehicle pilot lease in Ridgefield, Washington to advance behavior change campaigns and reduce fleet emissions.
|
| p062 | Department of Commerce |
Large Scale Solar Innovation Projects
|
Bellingham School District
|
Whatcom
|
Solar and grid | 558197 | 2319 | 240.71 | 241 | no | 104 |
Bellingham School District 501 will install 1,051 kW DC of solar across five Bellingham Public Schools. This construction project will reduce energy costs, allowing the district to reinvest savings into other essential services.
|
| p063 | Department of Commerce |
Competitive Solar Grants
|
Bellingham School District
|
Whatcom
|
Solar and grid | 594343 | 2469.1 | 240.71 | 241 | no | 92 |
Bellingham School District 501 will install 1,051 kW DC of solar across five Bellingham Public Schools. This construction project will reduce energy costs, allowing the district to reinvest savings into other essential services.
|
| p064 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Thurston
|
State agency vehicles and buildings | 23397 | 97 | 241.21 | 254 | no | 257 |
Funding is for an electric vehicle pilot lease in Olympia, Washington to advance behavior change campaigns and reduce fleet emissions.
|
| p065 | Department of Commerce |
Competitive Solar Grants
|
Central Washington University
|
Kittitas
|
Solar and grid | 468667 | 1941.1 | 241.44 | 241 | no | 92 |
This project will furnish and install a solar Photovoltaic (PV) system rated 123.48 kW DC / 100 kW AC at the Dugmore Hall building.
|
| p066 | Department of Agriculture |
Organic Materials Legislation
|
147 commercial farmers across 26 counties in Washington State collectively managing over 27,000 acres of farmland.
|
Statewide
|
Farms, soils and waste | 790771 | 3274.3 | 241.51 | 242 | no | 74 |
Funds were distributed as reimbursements to farmers for compost purchase and use.
|
| p067 | Department of Fish and Wildlife |
Greenhouse Gas Emissions Reductions
|
N/A
|
Chelan, Clallam, Clark, Columbia, Cowlitz, Grant, Grays Harbor, Jefferson, King, Kittitas, Kitsap, Klickitat, Mason, Okanogan, Pacific, Pierce, Skagit, Snohomish, Spokane, Stevens, Thurston, Whatcom, Yakima
|
State agency vehicles and buildings | 163668 | 647 | 252.96 | 267 | no | 257 |
Funding is for Commute Trip Reduction incentive program development and implementation.
|
| p068 | Department of Commerce |
Competitive Solar Grants
|
Western Washington University
|
Whatcom
|
Solar and grid | 318040 | 1204.8 | 263.98 | 264 | no | 93 |
Western Washington University installed a 111.9 kW DC (80 kW AC) rooftop solar system on the Science Math and Technology Education Building, expected to produce approximately 101,840 kWh annually and reduce greenhouse gas emissions by over 92,000 pounds each year. This project directly supports WWU’s Climate Neutrality by 2035 goal, advances compliance with the State Agency Climate Leadership Act, and showcases renewable energy for students in teacher- preparation programs. Construction is now complete, with the system fully operational and contributing to campus energy needs.
|
| p069 | Superintendent of Public Instruction |
School District Indoor Air Quality & Energy Efficiency- Less Than 3,000 Students
|
Orient School District
|
Ferry
|
Public and commercial building upgrades | 66726 | 252 | 264.79 | 23413 | no | 541 |
Orient Elementary School is replacing the entire HVAC system with a new hat pump chiller, a new boiler plant and a new building automation system controls upgrade.
|
| p070 | Department of Commerce |
Competitive Solar Grants
|
Anacortes School District
|
Skagit
|
Solar and grid | 444195 | 1597.3 | 278.09 | 278 | no | 94 |
Anacortes School District will install a solar Photovoltaic (PV) system rated for 134.8 kW DC / 100 kW AC at Anacortes High School. This solar system is part of the overall school district goals of decarbonization, student engagement, and energy conservation.
|
| p071 | Department of Agriculture |
Waste Material Management
|
Feeding Washington
|
Asotin, Benton, Clallam, Clark, Columbia, Cowlitz, Franklin, Garfield, Grays Harbor, Island, Jefferson, King, Kitsap, Kittitas, Lewis, Lincoln, Mason, Pacific, Pierce, San Juan, Skagit, Snohomish, Spokane, Stevens, Thurston, Wahkiakum, Walla Walla, Whatcom, Whitman
|
Farms, soils and waste | 1011764 | 3625 | 279.11 | 279 | no | 75 |
Feeding Washington used funding to purchase food at risk of being wasted from Washington Farms and distributed it to food pantries; grants supported Washington farmers by purchasing food not sold in the market, and they supported people experiencing food insecurity while reducing greenhouse gas emissions through food rescue.
|
| p072 | Department of Natural Resources |
Greenhouse Gas Emissions Reductions/ Infrastructure for Reducing Greenhouse Gas Emissions
|
N/A
|
Clallam
|
State agency vehicles and buildings | 14604 | 50.8 | 287.48 | 287 | no | 317 |
Purchased two Level 2 charging stations and upgraded infrastructure for future installation at Sappho Department of Natural Resources site.
|
| p073 | Department of Commerce |
23-25 Community EV Charging
|
Sno-Valley Senior Citizens
|
King
|
EV charging | 2606 | 8.8 | 296.14 | 297 | no | 131 |
Funds were used to build a reliable EV charging network in communities across Washington. This expenditure funds Direct Current fast chargers at public sites.
|
| p074 | Department of Natural Resources |
BEV 4x4 Truck Pilot Program
|
N/A
|
Skamania
|
State agency vehicles and buildings | 3365 | 11.3 | 297.79 | 298 | no | 312 |
Department of Natural Resources’ Sustainable Operations program installed one Level 2 EV charger at Fort Rains Department of Natural Resources site.
|
| p075 | Department of Commerce |
Electrical Grid Integration and Innovation
|
Douglas County Public Utilities District
|
Douglas
|
Solar and grid | 95771 | 313.4 | 305.59 | 306 | no | 101 |
This project establishes a dual-purpose refueling site adjacent to State Highway 28, featuring both DC fast charging (DCFC) for electric vehicles and a green hydrogen refueling station. It supports a broader range of zero-emission vehicles, strengthens clean transportation infrastructure in central Washington, and promotes the adoption of both battery-electric and hydrogen fuel cell technologies.
|
| p076 | Department of Commerce |
Local Grants for Energy and Operational
|
Edmonds School District
|
Snohomish
|
Public and commercial building upgrades | 5482 | 17.8 | 307.98 | 308 | no | 91 |
Grants are made to owners of public buildings for the retrofit of existing facilities that achieve energy and operational cost savings. A higher energy savings to investment ratio must result in a higher project ranking.
|
| p077 | Department of Transportation |
LEAP Document 2024-2 Tribal Transit Grants
|
Lummi Nation
|
Whatcom
|
Transit buses and service | 213074 | 684.2 | 311.42 | 364 | no | 383 |
Funding to convert six buses from gas to propane. Upgrade facilities to support propane fueling including the purchase and installation of a concrete pad and bollard posts for two propane storage tanks, a tank lockout system, and security fencing and lighting.
|
| p078 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Whatcom Conservation District
|
Whatcom
|
Farms, soils and waste | 79739 | 252 | 316.42 | 316 | no | 493 |
This work involved the addition of a separator to a dairy's waste management system to reduce greenhouse gas emissions.
|
| p079 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Pierce Conservation District
|
Pierce
|
Farms, soils and waste | 101665 | 319 | 318.70 | 319 | no | 491 |
This funding was to provide cost-share assistance to a producer to purchase a 24' no-till drill to use to seed 635 acres of pasture and crop ground on an organic dairy.
|
| p080 | State Conservation Commission |
Riparian Restoration with Landowners (RGP)
|
Clallam Conservation District
|
Clallam
|
Habitat and forests | 233366 | 726 | 321.44 | 321 | no | 507 |
Clallam Conservation District conducted outreach, technical assistance, and buffer implementation using Riparian Grant Program funds. The district reached 6,455 landowners, assisted 48, installed 41.84 acres of buffers, and maintained 114.32 acres of riparian plantings.
|
| p081 | Department of Natural Resources |
Greenhouse Gas Emissions Reductions/ Infrastructure for Reducing Greenhouse Gas Emissions
|
N/A
|
Lewis
|
State agency vehicles and buildings | 27461 | 84.7 | 324.21 | 324 | no | 317 |
Purchased two Level 2 charging stations and upgraded infrastructure for future installation at Chehalis Department of Natural Resources site.
|
| p082 | State Conservation Commission |
Sustainable Farms and Fields (CCA)
|
Whatcom Conservation District
|
Whatcom
|
Farms, soils and waste | 21563 | 66 | 326.71 | 327 | no | 493 |
This project supplied cover crop seeds to dairy fields to both store carbon and reduce the risk of runoff and nutrient pollution in local waters.
|
| p083 | Department of Transportation |
Bus and Facility Grants
|
Kitsap Transit
|
Kitsap
|
Transit buses and service | 1412558 | 4291.1 | 329.18 | 329 | no | 381 |
The grantee purchased eight expansion electric inductive chargers.
|
| p084 | Department of Commerce |
2023-25 Community Solar
|
Port Angeles Food Bank
|
Clallam
|
Solar and grid | 296451 | 875 | 338.80 | 339 | no | 129 |
The Port Angeles Food Bank is installing a 99.62 kW rooftop solar system with 229 panels to offset approximately 62% of its annual energy use, generating about 105,479 kWh per year. This project reduces greenhouse gas emissions and allows cost savings to be reinvested in fresh food purchases and the Friday Food Bag program, which serves over 700 children weekly.
|
| p085 | Department of Commerce |
2023-25 Community Solar Resilience Hubs
|
Friday Harbor Presbyterian Church
|
San Juan
|
Solar and grid | 14944 | 43.3 | 345.13 | 345 | no | 125 |
Friday Harbor Presbyterian Church will install a 49.8 kW DC / 48.4 kW AC solar array and a 7.68 kW / 20.1 kWh battery energy storage system. This project will provide power to essential services like kitchen, storage, and gathering space during power outages.
|
| p086 | Department of Enterprise Services |
Zero Emission EV Supply Equipment Infrastructure
|
Department of Children, Youth and Families
|
Pierce
|
EV charging | 35271 | 101.6 | 347.16 | 354 | no | 253 |
The Department of Children, Youth and Families installed four Dual Head L2 chargers in the Puyallup field office.
|
| p087 | State Conservation Commission |
Riparian Restoration with Landowners (RGP)
|
Jefferson County Conservation District
|
Jefferson
|
Habitat and forests | 197509 | 568 | 347.73 | 348 | no | 508 |
Jefferson County Conservation District provided technical assistance for riparian restoration in the Chimacum and Tarboo watersheds, both on the 303(d) list for temperature and fecal coliform. Work with five landowners resulted in 23,270 trees and shrubs planted on 32.73 acres. Maintenance on older sites across Water Resource Inventory Area 17 removed 860 pounds of plastic tree tubes from 16 sites, improving riparian health on both public and private lands.
|
| p088 | Department of Commerce |
2023-25 Community Solar Resilience Hubs
|
Port of Camas Washougal
|
Clark
|
Solar and grid | 71870 | 206.5 | 348.04 | 348 | no | 124 |
Port of Camas Washougal will install a 22.4 kW DC / 22.8-kW AC solar array and a 6.7 kW / 18 kWh battery energy storage system. This project will power servers, lighting and additional power needs in the event of a power outage.
|
| p089 | Department of Commerce |
Competitive Solar Grants
|
City Of Sumner
|
Pierce
|
Solar and grid | 151015 | 433.6 | 348.28 | 348 | no | 93 |
The City of Sumner installed a 71.8 kW DC (50 kW AC) rooftop solar system on its historic 1935 City Hall, designed to produce roughly 75,000 kWh annually, offsetting over 33% of the building’s energy use and reducing greenhouse gas emissions. This project directly supports Sumner’s strategic priority to protect natural resources while lowering future utility costs and freeing local funds for other essential services. Construction is now complete, and the system is operational.
|
| p090 | Department of Commerce |
2023-25 Community Solar Resilience Hubs
|
Marrowstone Island Foundation
|
Jefferson
|
Solar and grid | 2865 | 7.8 | 367.31 | 367 | no | 126 |
East Jefferson Fire and Rescue Station 5 will install a 23.1 kW DC solar array and a 46 kW / 54 kWh battery energy storage system. This setup will supply backup power to support emergency services during power outages and natural disasters.
|
| p091 | Department of Commerce |
Competitive Solar Grants
|
City Of Olympia
|
Thurston
|
Solar and grid | 47012 | 127.7 | 368.14 | 368 | no | 94 |
The City of Olympia is installing a 134.4 kW DC rooftop solar system on Fire Station 1 that will produce approximately 122,268 kWh annually, offsetting 85% of the station’s energy use and cutting 109,000 pounds of CO ₂ emissions each year. This project, identified as a community priority through the Thurston Climate Mitigation Plan, will save an estimated $542,000 over 25 years, allowing more city resources to be directed toward essential services.
|
| p092 | Department of Commerce |
2023 - 25 Community Solar Resilience Hubs
|
Vashon United Methodist Church
|
King
|
Solar and grid | 1297 | 3.5 | 370.57 | 371 | no | 129 |
This project will install a 30 kW DC / 22.8 kW AC solar array and a 36 kW / 81 kWh battery energy storage system at Vashon United Methodist Church. The system will provide backup power to support services for vulnerable populations during power outages.
|
| p093 | Department of Commerce |
Competitive Solar Grants
|
City Of Des Moines
|
King
|
Solar and grid | 135658 | 365 | 371.67 | 372 | no | 92 |
This project will furnish and install an approximately 50 kW DC solar Photovoltaic (PV) system on the Des Moines Senior Center’s rooftop.
|
| p094 | Department of Commerce |
Local Grants for Energy and Operational
|
Benton County Sustainable Development
|
Benton
|
Public and commercial building upgrades | 394440 | 992 | 397.62 | 398 | no | 91 |
Grants are made to owners of public buildings for the retrofit of existing facilities that achieve energy and operational cost savings. A higher energy savings to investment ratio must result in a higher project ranking.
|
| p095 | Department of Commerce |
23-25 Community EV Charging
|
The Suquamish Tribe
|
Kitsap
|
EV charging | 50000 | 125.6 | 398.09 | 1963 | no | 131 |
Funds were used to build a reliable EV charging network in communities across Washington. This expenditure funds Level 2 Chargers and Direct Current fast chargers at public, workplace sites.
|
| p096 | Department of Transportation |
LEAP Document 2023-2 Transit Projects
|
King County Metro Transit
|
King
|
Transit buses and service | 5000000 | 12551.6 | 398.36 | 398 | no | 382 |
Convert Metro's existing Interim Base, located on Metro's South Base Campus, to an all-battery electric bus facility, including construction of electrical power and bus charging infrastructure, performance of civil sitework, and installation of charge management systems as well as other systems required to support 120 new battery electric buses.
|
| p097 | Department of Agriculture |
Waste Material Management
|
EastWest Food Rescue
|
Adams, Clark, King, Okanogan, Pierce
|
Farms, soils and waste | 156118 | 391 | 399.28 | 399 | no | 75 |
EastWest Food Rescue used funding to purchase food at risk of being wasted from Washington Farms and distributed it to food pantries; grants supported Washington farmers by purchasing food not sold in the market, and they supported people experiencing food insecurity while reducing greenhouse gas emissions through food rescue.
|
| p098 | Department of Commerce |
Competitive Solar Grants
|
Southside School District
|
Mason
|
Solar and grid | 493075 | 1214.7 | 405.92 | 406 | no | 93 |
Southside School District is installing a 96.5 kW DC (100 kW AC) rooftop solar system expected to produce 108,062 kWh annually, offsetting 25% of the campus energy use and cutting 165,000 pounds of CO ₂ each year. This project will reduce operating costs, freeing local funds to improve HVAC systems so all students can benefit from better air quality and climate control. Construction is now being completed, with commissioning and closeout targeted by July 2025.
|
| p099 | Department of Commerce |
Large Scale Solar Innovation Projects
|
City of Walla Walla
|
Walla Walla
|
Solar and grid | 1329770 | 3236.7 | 410.84 | 411 | no | 105 |
The City of Walla Walla will install a 432.6kW DC ground mount solar array paired with a 125kW battery energy storage system. This construction project will reduce utility costs at the City of Walla Walla Water Treatment Plant.
|
| p100 | Department of Commerce |
2023-25 Community Solar Resilience Hubs
|
Joyce L. Sobel Family Resource Center
|
San Juan
|
Solar and grid | 16647 | 39.8 | 418.27 | 418 | no | 126 |
Joyce L. Sobel Family Resource Center will install an 11.2-kW DC / 10.2 kW AC expansion solar array connected to an existing solar array and a 7.68 kW / 21 kWh battery energy storage system. These systems will enable continuous access to social services for vulnerable populations during emergencies.
|
13 field definitions
| Field | Type | Meaning | Units | Value type |
|---|---|---|---|---|
project_id |
string | FactHub row id, ordered by cost per ton. | — | derived |
agency |
string | Reporting state agency. | — | observed |
program |
string | Appropriation title as printed. | — | observed |
recipient |
string | Pass-through recipient, or N/A when the agency spent the money itself. | — | observed |
county |
string | County or Statewide. | — | observed |
category |
string | FactHub project type. | — | derived |
fy2025_cca_spending_usd |
number | Fiscal year 2025 expenditure (sum of all CCA accounts on the row). | US dollars | observed |
lifetime_reduction_tco2e |
number | Projected greenhouse gas cut over the project’s lifetime. | metric tons CO2-equivalent | estimated |
cost_per_ton_usd |
number | Spending divided by lifetime tons. | US dollars per metric ton CO2e | derived |
reported_cost_per_ton_usd |
number | Cost per ton as printed in the report, which some agencies computed on another cost basis. | US dollars per metric ton CO2e | observed |
possible_duplicate_tonnage |
string | yes if the row repeats another row’s full tonnage for the same project. | — | derived |
report_pdf_page |
integer | Page of the PDF file (not the printed page number) where the row starts. | — | observed |
description |
string | Project description as printed. | — | observed |