Link farebox recovery, 2017-2025
Question: What share of Link light rail operating costs did fares cover each year?
Result: Fares covered 43% of Link operating costs in 2017, 34% in 2019 and 12% in 2024 and 2025, below the 17% minimum and 22% target the Board set in 2024 (and far below the 40% required before then).
Operation: farebox_reported by year from the link-annual table.
Scope: Link light rail
- 2021 not available. Operating costs include start-up costs for extensions before they carried riders.
- Policy thresholds changed in May 2024, so earlier years were measured against a 40% requirement.